According to the requirements of the State to accelerate the construction of crude oil reserve facilities and the deployment of China Petrochemical Corporation, in order to meet the actual needs of China's economic development and effectively implement the national energy development strategy, better utilize the international imported crude oil resources, enhance the international competitiveness and risk resistance of China Petroleum enterprises, China Petroleum plans to construct a batch of crude oil commercial reserve bases.
The project is located on the west side of the North Mountain crude oil depot of Maoming Petrochemical Company, between North Mountain and Xiacun, which is about 150-200m away from the coastline. It mainly consists of the construction of 16 100,000 cubic meter external floating roof double-drum crude oil storage tanks and supporting facilities, covering an area of (33.3 hectares) and a total capacity of 1.875 million cubic meters, including 15 tanks with a capacity of 125,000 cubic meters for crude oil storage, as well as supporting facilities. The main facilities include a 6KV/0.38KV transformer substation project, a pumping station project, a metering station project, a foam station project, an oil-containing wastewater pool project, a topographic engineering project, and supporting process piping engineering, water supply and drainage piping engineering, firefighting piping engineering, electrical and instrumentation engineering, power supply external line engineering, greening engineering, etc.
In the construction of the vibro-drilled gravel column foundation project, 20 sets of equipment were operated simultaneously, and the equipment was all vibroflot produced by Beijing Vibroflotation Engineering Machinery Co., LTD.