Home » Blogs

Blogs

  • Vibroflotation In Grand Canal Period

    2024-08-28

    This vibro-replacement stone column construction is carrying out by BVEM. The measured buried depth of the stable groundwater level in the engineering area is 2.00 ~ 5.90m. After testing, the environmental water has sulfate type weak corrosivity to concrete. The whole geology is sandy. The lithology Read More
  • Maoming North Mountain Oil Commercial Reserve Base Pile Foundation Engineering Project

    2024-08-28

    According to the requirements of the State to accelerate the construction of crude oil reserve facilities and the deployment of China Petrochemical Corporation, in order to meet the actual needs of China's economic development and effectively implement the national energy development strategy, bette Read More
  • Smoke Pipe Expansion And Upgrade Project In Changyi Oil Terminal with Vibroflot

    2024-08-28

    The proposed smoke pipeline expansion and upgrade project in Changyi Oil Station, located in Changyi City, Shandong Province, China, will be undertaken by Beijing Vibroflotation Engineering Machinery Co., LTD. based on the project's specifications, leveraging its organizational and operational advan Read More
  • Total 6 pages  Go to Page
  • Go
BVEM is the larges manufacturer of electric-driven vibrator equipment in Asia.

Quick Links

Product Category

Contact Us
​Copyright © 2024 Beijing Vibroflotation Engineering Machinery Co., Ltd. All rights reserved. | Sitemap | Privacy Policy 京ICP备12032585号-10